The theoretical productivity of HZS75 concrete mixing plant is 75 cubic meters per hour,Equipped with JS1500 double horizontal shaft forced mixer,HZS75 concrete mixing station is a fully automatic concrete mixing set equipment composed of batching, mixing and electrical control system,At the same time, it is equipped with separate manual control, automatic compensation of drop, and compensation of sand and stone moisture content,Can automatically complete the predetermined tank production。With the scientific design of the hopper and track, the aggregate can be conveniently and efficiently held and dumped, and the unloading height is 3.8 meters, with a small amount of investment capital, occupy a small site, less use of equipment, equipment maintenance is easy, easy to operate and other advantages。HZS75 series concrete mixing plant is composed of batching, mixing, electrical control system and other parts of the automatic concrete mixing set equipment, while equipped with a separate manual control, automatic compensation of drop, sand and stone moisture content compensation, can automatically complete the predetermined tank production.The theoretical productivity is 75 cubic meters per hour and the unloading height is 3.8 meters, the storage hopper volume is 8 cubic *3 bins or 4 bins, the supporting host is JS1500 forced double horizontal shaft mixer。The investment capital of HZS75 mixing plant is small, the space is small, the equipment is less, the equipment is easy to maintain, and the equipment can be equipped with the performance control room, so that the equipment is convenient and safe to operate, and the batching machine can also produce high-quality concrete under the condition of accurate measurement。Performance advantages: 1, the use of combined structure, the whole machine installation, relocation is convenient, low equipment cost。2、优质灰盆producerJS series double horizontal shaft forced concrete mixer is used in the host, which has good mixing quality, high efficiency, long life of wearing parts and easy operation and maintenance。3、灰盆producerIt adopts new design ideas of electronic weighing, microcomputer control, digital display and other control technology, electronic weighing with buffer device and automatic compensation function, high measuring precision。4, the sand and gravel feeding system adopts large width herringbone belt feeding, with pedestrian walkway, is the ideal choice for the majority of construction units to produce high-quality concrete。
绵阳优质灰盆When loading, the mixture to be stirred is installed in the hopper, the feeding system is started, the wire rope pulls the hopper to climb up, when climbing to a certain height, the hopper enters the loading rack, the hopper door automatically opens, and the material is unloaded into the mixing cylinder through the funnel。JS750 mixer mixing system is composed of motor, pulley, reducer, gear, mixing device, mixing cylinder and so on。The main motor is connected to the two-stage gear reducer through the belt, and finally through the two pairs of open gears respectively drive the two horizontal mixing shaft to rotate towards the same speed。The electrical control system needs to control the main drive motor of the JS750 mixer, the motor of the water supply system, the motor of feeding, unloading, etc。All electrical control elements are located in the distribution box。The electrical components in the distribution box are installed on an iron plate, which is safe and reliable, easy to operate and maintain。The discharge system is at the bottom of the mixer, and the discharge is carried out by a manual push rod。According to customer requirements, we can produce mixers in the form of electric push rod discharge。The connection between the discharge door and the mixing cylinder shall be sealed with a sealing plate.灰盆producerThe position of the seal plate can be adjusted to ensure the purpose of sealing。
1.Performance label of construction concrete;优质灰盆From this to choose what kind of mixing machine。Such as water conservancy projects must choose a forced mixing host。In addition, the batching station and storage bin should be selected according to the types of concrete materials that can be mixed。2.The task quantity and duration of concrete construction;Use these two parameters to choose how big the mixing plant is。The total task quantity of concrete is set as M;The number of days for concrete pouring is T;The working hours per day are H;If the utilization factor is K, the specification of the mixing plant X=M/(T*H*K) should be selected, where K is 0.7-0.9。The transportation condition of finished concrete should also be considered in the selection。Such as: direct pumping or vehicle delivery。The volume of the conveying vehicle is also an important basis for determining the type of mixing station。3.Construction environment and construction object;When choosing to purchase a concrete mixing plant, the impact of the construction object and the construction environment should be fully considered, so as to ensure the smooth construction and construction quality。In the following cases, we recommend that you be prepared。4.When the site needs to pour a large amount of one-time, high quality requirements, and there is no nearby reinforcement of the mixing plant, choose two smaller specifications of the mixing plant, or choose a master a pair of dual machine preparation。5.When the site traffic is inconvenient and maintenance personnel need to spend a lot of time entering and leaving the site, choose to use the same smaller specifications of the dual machine station, or prepare enough spare parts, so as to ensure the smooth construction progress。6.When the construction site is more dispersed, but the distance between the sites is not too far, the transport radius of the concrete mixing truck is not more than half an hour by car, and the transport of the dump truck is not more than 10 minutes by car。The use of multi-number centralized mixing to improve the utilization rate of mixing plant and construction economic benefits。7.The quality of operators;Generally speaking, the structure of the small mixing plant is simple, and the control system is also simple, so the requirements for operation and maintenance personnel are low。The larger station structure is complex and the degree of automation is high, so the requirements for operators are also high。Therefore, in addition to the previous factors, you should also consider this factor when purchasing a mixing plant。8.Preparation selection;Under normal circumstances, the manufacturer has a mature product preparation, such as specifications, quantities, varieties, etc。You can make your special request when ordering the product。We will do our best to meet your requirements。However, in the purchase of products should not be greedy, which will cause economic waste。In addition to referring to the prices of different manufacturers when purchasing products, special attention should be paid to the preparation lists of different manufacturers。灰盆producerIn addition to the above specifications, varieties and quantities, the most important thing is the manufacturer of the parts。In summary, you can always choose the most suitable model for you。In the choice of models do not pursue the good, but should pursue the most suitable and meet your needs, because such a choice is the most economic and most effective。
In the production process of concrete mixing station,优质灰盆producerEquipment cleaning and vehicle cleaning process will produce a lot of sewage wastewater。At the same time, direct emissions will also cause great harm to the environment。Therefore, the sewage transformation treatment system in concrete production will realize 100% recovery of its wastewater and achieve zero sewage discharge standards。Sewage treatment and renovation system mainly includes concrete transport team discharge chute, sand separator equipment, sewage settling tank, sewage tank agitator, clarification tank, transport pump, filter press, etc。The conventional system has a total of four sump tanks and three clarifier tanks。Each of the 4 sump ponds has a surface guardrail and agitator。And No. 1 pool, No. 2 pool, No. 3 sewage pool is equipped with mud type pump, No. 2 and No. 4 pool is designed with liquid level meter;3 clarifier tanks You each have a sewage type pump。The periodic uniform movement of the agitator in the tank ensures that the water quality in the tank is uniform。The various pools in the sewage treatment system need to be arranged in a certain order, and the overflow pipes are connected to each other at the lower part of the pool, and the pumps are connected to each other at the upper part。When the amount of water in the pool is insufficient, the pump can be used to transport water to maintain the stability of the water。If there is a lot of water in the pool, it will flow back through the overflow pipe provided in the pool, and the water quality will be clarified during the reflux process。In the concrete mixing station, there is a flow tank connected with the sewage tank to collect rainwater into the pool to ensure the cleanliness of the station and reduce the operating cost。The main station and the vehicle cleaning system are equipped with a special flow tank to divert the production sewage to the sewage tank for unified treatment。Through the guided transformation of the entire drainage in the concrete mixing station, the sewage in the mixing station is not drained, and the treated sewage is directly supplied to the mixing station for use and vehicle cleaning after inspection, and the waste residue generated can also be used as added aggregate。优质灰盆Achieve zero discharge of sewage treatment。